Tube T or Y Shape Borosilicate Glass For Connection

SKU: 28.2310.0007 | UOM: Each

T and Y connection tube manufactured from borosilicate glass 3.3 for securely connecting laboratory tubing and glass apparatus in gas and liquid handling systems.

✓
Borosilicate Glass 3.3
✓
Chemical Resistant
✓
Laboratory Grade
✓
T & Y Connector
7mm (Dia) T Shape
$21.40
Visa Mastercard Apple Pay Google Pay

Available Sizes / Specifications

SKU Pack Size Description Socket Size Size (mm) Length (mm) Sub Div (ml)
28.2310.0007 12 T Shape 10/19 7 100 x 12 0.1
28.2310.0010 12 T Shape 12/21 10 — 0.1
28.2310.0012 12 T Shape 19/26 12 — 0.5
28.241.0007 12 Y Shape — 7 — —
28.241.0010 12 Y Shape — 10 — —
28.241.0012 12 Y Shape — 12 — —

Trade Customer or Need a Bulk Quote?

If you require bulk quantities, ongoing supply or customer-specific pricing, our team can help.

Speak with us about trade pricing, regular orders and tailored quotes for your laboratory requirements.

Material Borosilicate Glass 3.3
Form T or Y Shape Connection Tube
Scale Not Applicable
Standard Laboratory Use
Features Socket Joint Design, Borosilicate Glass 3.3 Construction, Excellent Chemical Resistance, Thermal Shock Resistance, Durable Laboratory-Grade Design
Applications Laboratory Testing, Sample Preparation, Chemical Analysis, Heating Applications, Research Laboratories, Educational Laboratories, Quality Control Testing

About this product

T or Y Shape Connection Tube is designed to provide reliable connections between laboratory tubing, glassware, and process equipment for the distribution of gases and liquids. Manufactured from premium borosilicate glass 3.3, it offers outstanding chemical resistance, excellent thermal shock resistance, and long service life in demanding laboratory environments.

No downloads available yet.

Estimated delivery times for in-stock items after dispatch:

Metropolitan Areas

  • Perth: 1–2 business days
  • Adelaide: 3–5 business days
  • Melbourne: 3–5 business days
  • Sydney: 3–5 business days
  • Canberra: 3–5 business days
  • Brisbane: 3–5 business days
  • Hobart: 3–5 business days
  • Darwin: 3–5 business days

No FAQs available yet.