A&D AD4541-I Analog Signal Conditioner 4–20mA Current Output for Industrial Process Control

SKU: AD4541-I | UOM: Each

The A&D AD4541-I Signal Conditioner converts millivolt sensor signals into a 4–20mA current output for reliable industrial monitoring and process control with simple calibration and flexible mounting options.

✓
4–20mA Current Output
✓
Signal Conditioning
✓
DIN-Rail Mounting
✓
Process Control
Regular price $655.50 AUD
🚚 Australia-Wide Shipping
💳 100% Secure Payments
⚙ Industry Leading Quality
Visa Mastercard Apple Pay Google Pay

About this product

The A&D AD4541-I Analog Signal Conditioner converts millivolt signals from load cells and compatible sensing devices into a 4–20mA current output. It provides simple calibration and flexible mounting for industrial monitoring and process control applications.

Key Features

  • 4–20mA current output
  • Accepts analogue millivolt signals from load cells and sensing devices
  • Simple potentiometer-based calibration
  • Zero adjustment range from -0.5mV/V to +0.5mV/V
  • Span adjustment range from 0.4mV/V to 3.2mV/V
  • Snap-on DIN-rail or screw mounting
  • Spring-clip terminals for tool-free wire termination
  • Compact housing for control panel installation

Specifications

  • Brand: A&D
  • Model: AD4541-I
  • Product Type: Analogue Signal Conditioner
  • Input: Millivolt signal
  • Output: 4–20mA current
  • Zero Adjustment Range: -0.5mV/V to +0.5mV/V
  • Span Adjustment Range: 0.4mV/V to 3.2mV/V
  • Mounting: DIN rail or screw mount
  • Dimensions: 45 x 122 x 24 mm

Trade Customer or Need a Bulk Quote?

If you require bulk quantities, ongoing supply or customer-specific pricing, our team can help.

Speak with us about trade pricing, regular orders and tailored quotes for your laboratory requirements.

Estimated delivery times for in-stock items after dispatch:

Metropolitan Areas

  • Perth: 1–2 business days
  • Adelaide: 3–5 business days
  • Melbourne: 3–5 business days
  • Sydney: 3–5 business days
  • Canberra: 3–5 business days
  • Brisbane: 3–5 business days
  • Hobart: 3–5 business days
  • Darwin: 3–5 business days

No FAQs available yet.