Dropping Funnel Cylindrical Borosilicate Glass Plain With Polypropylene Stopper

SKU: 26.559.0005 | UOM: Each

Cylindrical dropping funnel with PP Super Stopper™ for controlled addition of liquids. Manufactured from borosilicate glass 3.3 and compliant with DIN ISO 4800 standards.

✓
DIN ISO 4800
✓
Borosilicate Glass 3.3
✓
Chemical Resistant
✓
Laboratory Grade
50ml Glass Stopcock
$0.00
Visa Mastercard Apple Pay Google Pay

Available Sizes / Specifications

SKU Capacity (ml) Pack Size Size
26.559.0005 50 2 14/23
26.559.0010 50 2 29/32
26.559.0015 100 2 14/23
26.559.0020 100 2 29/32
26.559.0025 250 1 29/32
26.559.0030 500 1 29/32
26.559.0035 1000 1 29/32
26.561.0005 50 2 14/23
26.561.0010 50 2 29/32
26.561.0015 100 2 14/23
26.561.0020 100 2 29/32
26.561.0025 250 1 29/32
26.561.0030 500 1 29/32
26.561.0035 1000 1 29/32
26.563.0005 50 2 14/23
26.563.0010 50 2 29/32
26.563.0015 100 2 14/23
26.563.0020 100 2 29/32
26.563.0025 250 1 29/32
26.563.0030 500 1 29/32
26.563.0035 1000 1 29/32

Trade Customer or Need a Bulk Quote?

If you require bulk quantities, ongoing supply or customer-specific pricing, our team can help.

Speak with us about trade pricing, regular orders and tailored quotes for your laboratory requirements.

Material Borosilicate Glass 3.3
Form Squibb Separating Funnel
Scale White Graduated Scale
Standard DIN ISO 4800
Features Squibb Shape, PP Super Stopper™, Borosilicate Glass 3.3, Chemical Resistant, Secure Closure, Easy Phase Separation
Applications Liquid-Liquid Extraction, Phase Separation, Solvent Partitioning, Chemical Analysis, Sample Preparation, Laboratory Testing

About this product

Cylindrical Dropping Funnel with PP Super Stopper™ is designed for the controlled addition of reagents, solvents, and other laboratory liquids during chemical reactions and analytical procedures. Its cylindrical design allows precise dispensing, making it ideal for research, educational, industrial, and quality control laboratories.

No downloads available yet.

Estimated delivery times for in-stock items after dispatch:

Metropolitan Areas

  • Perth: 1–2 business days
  • Adelaide: 3–5 business days
  • Melbourne: 3–5 business days
  • Sydney: 3–5 business days
  • Canberra: 3–5 business days
  • Brisbane: 3–5 business days
  • Hobart: 3–5 business days
  • Darwin: 3–5 business days

No FAQs available yet.